Based on the proposed model, total transfer capability (TTC) of power system containing large-scale wind farms is investigated under the constraint condition of static voltage stability.
利用这一模型,针对含有大型风电场的输电系统,对其静态电压稳定约束条件下的最大输电能力(TTC)展开研究。
Testing results show that the major factors affecting the deposition efficiency are the welding current, arc voltage and gas flow rate under the condition of same circuit inductance.
试验结果表明,在回路电感值不变的条件下,焊接电流、电弧电压和气体流量是影响熔敷效率的主要因素。
Under the proper simplified condition, the calculation formulas of rectification voltage and phase current were deduced out respectively and were testified by experiment.
在适当的简化条件下,推导出各自整流电压和相电流的计算公式,并通过了试验验证。
应用推荐